Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0823-00345

Parcel: 140420760

Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
09/27/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Walked site with Superintendent Ryan Phipps all exposed trenches and construction areas are surrounded by orange fencing and set up and controls are in place.

Ryan will call in the inspection every 2 weeks until all job site work is completed.