Permit: TD-DEV-0823-00345

Parcel: 140420760

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
09/27/2023 PDSD Engineering Division Pre-Construction SITE Passed Completed site walk with Superintendent Ryan Phipps and went over existing drainage areas in complex and requirements that would be needed such as wattle etc. if they will be working close to those areas, all small open trench areas are enclosed with temporary orange fencing and site is clean of debris and construction materials.
Ryan will call in a stormwater inspection every 2 weeks per my request until completion of all job site work.