Permit Details

Status:
Complete
Type:
Development Package
Address:
523 E GAY ST
Address NEW:
523 E GAY ST
Apply Date:
07/29/2025
Applicant:
Grace Stocksdale
Description:
New building, single story warehouse.

Permit Reviews

Permit Number - TD-DEV-0725-00200
Permit Status: Complete
Permit Description: New building, single story warehouse.
Start Date Submittal Complete Date Status  
07/30/2025 DEVELOPMENT PACKAGE NEW v.1 08/29/2025 REQUIRES RESUBMIT Review Details
01/08/2026 DEVELOPMENT PACKAGE NEW v.2 01/23/2026 REQUIRES RESUBMIT Review Details
04/21/2026 DEVELOPMENT PACKAGE NEW v.3 05/01/2026 APPROVED Review Details
08/19/2026 AS-BUILT v.1 08/21/2026 APPROVED Review Details

Conditions

Permit Number - TD-DEV-0725-00200
Permit Status: Complete
Permit Description: New building, single story warehouse.
Date Description Comments
05/01/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0725-00200
Permit Description: New building, single story warehouse.
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/13/2026 PDSD Engineering Division Pre-Construction SITE Passed Building is finished sidewalks are done. AB is down. Owner wants to pave on Friday. He needs to put in a thickened edge at all perimeter edges and along the landscaping and existing asphalt per the AC edge detail. Compaction tests for Subgrade and AB need to be submitted to portal. Schedule inspection for paving. Chalk lines at building and curb for AC thickness look like less than 2.5” in plans. The basin at the street is not dug yet that will be done last. He wants to move the trees from the rear of the building into the basin. The rear of the building is poured concrete not DG. It drains from the middle out to either side sidewalk slopes are good. Scuppers in sidewalk are less than 3/16". Detail calls for 3/16" This needs to be addressed. Plans show 6" extruded curb with curb cuts at pedestrian refuge area.
05/28/2026 ENGR Paving Passed
09/14/2026 Passed
09/14/2026 ENGR Engineering Final Passed
09/14/2026 SITE - Zoning Final Passed

Documents

File Name Document Type  
TD-DEV-0725-0020 DP1.0 8-10-26-L1_V1.PDF DOCUMENTS VIEW
APPROVED - DP1.0 4-2-26_V2 - STAMPED 05.01.2026.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
DRAINAGE REPORT 062425_V1.PDF DOCUMENTS VIEW
GAY ST EASEMENT_V1.PDF DOCUMENTS VIEW
IMG_20260327_0001_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER (2).PDF DOCUMENTS VIEW
TEP MAP (1).PDF DOCUMENTS VIEW