Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0725-00200

Parcel: 106012190


Addresses:

523 E GAY ST

Inspection Status: Failed

Inspection History: ENGR Paving

Date Description Inspector Results Comments
05/20/2026 ENGR Paving Failed No compaction reports were given. TSM Section 7-04.2 requires physical separation between vehicle area and sidewalk. There is only 4" of vertical separation. The minimum vertical separation is 6". At west side of lot the vertical separation tapers to 0". I need written a written acceptance letter of this verical separation and of all plan changes by site Engineering. (You mentioned Steven Blood).
05/28/2026 ENGR Paving Passed