Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3302 E SPEEDWAY BL
Apply Date:
07/25/2024
Applicant:
Blake Junak
Description:
Re-development of existing shopping center to include addition of (2) patios

Permit Reviews

Permit Number - TD-DEV-0724-00217
Permit Status: Complete
Permit Description: Re-development of existing shopping center to include addition of (2) patios
Start Date Submittal Complete Date Status  
08/01/2024 DEVELOPMENT PACKAGE NEW v.1 09/12/2024 REQUIRES RESUBMIT Review Details
09/23/2024 DEVELOPMENT PACKAGE NEW v.2 11/07/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0724-00217
Permite Description: Re-development of existing shopping center to include addition of (2) patios
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
06/02/2025 Consultation SITE N/A Partial Pass contractor had a consultation with me about the striping on the East side of the building in the parking lot area about the handicap parking everything needed to be 2% in every direction
07/01/2025 ENGR Paving N/A Not Applicable
05/16/2025 For trash and recycling enclosures N/A Partial Pass 5/16/25. Slab and apron poured and correct. Wall is 9 courses on top of footer. 69" above slab.
Gates and 1” retaining pipe in slab not installed yet.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0724-00217
Permit Description: Re-development of existing shopping center to include addition of (2) patios
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/06/2025 PDSD Engineering Division Pre-Construction SITE Passed Inform the contractor he needs to call in every two weeks for the swept inspections. Informed him that he needed third-party testing for the footers, sidewalks, ramps, etc..
09/26/2025 For trash and recycling enclosures Passed
10/22/2025 ENGR Engineering Final Passed
10/22/2025 SITE - Zoning Final Passed