Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2025 | For trash and recycling enclosures | Partial Pass | Depth, rebar size & placement is good. Ready to pour footing. | |
| 04/30/2025 | For trash and recycling enclosures | Partial Pass | Contractors good to pour the grout for the trash enclosure walls | |
| 05/06/2025 | For trash and recycling enclosures | Partial Pass | Wall grout is good, bollards are in place. We will need to inspect rebar before slab is poured. | |
| 05/09/2025 | For trash and recycling enclosures | Partial Pass | Slab rebar is good, dimensions and slope are good, okay to pour slab. | |
| 05/16/2025 | For trash and recycling enclosures | Partial Pass | 5/16/25. Slab and apron poured and correct. Wall is 9 courses on top of footer. 69" above slab. Gates and 1” retaining pipe in slab not installed yet. |
|
| 09/26/2025 | For trash and recycling enclosures | Passed | ||
| 09/26/2025 | For trash and recycling enclosures | Passed |