Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Inform the contractor he needs to call in every two weeks for the swept inspections. Informed him that he needed third-party testing for the footers, sidewalks, ramps, etc.. |