Inspection History Details
Inspection Status: Not Ready
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0723-00310
Inspection Description - For trash and recycling enclosures
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2025 | For trash and recycling enclosures | Not Ready | 12/10/25 I talked to mason and superintendent about the specifics of TSM double Refuse enclosure and inspections needed. However Rebar reinforcing not in place yet in footer. |
|
| 12/11/2025 | For trash and recycling enclosures | Re-inspection required (with fee) | Bollards not in place for pour. 2nd not ready. | |
| 12/12/2025 | For trash and recycling enclosures | Partial Pass | 12/12/25 Footer dimensions and reinforcing correct. Bollard footers correct. Footer okay to pour. Request inspection for pregrout when wall is built per plan and ready with bond beam at top. Use ladders horizontal reinforcement at 16" oc. |
|
| For trash and recycling enclosures | Scheduled |