Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Paving
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2026 | ENGR Paving | Partial Pass | Okay to install AB pending approved compaction. Flood test required at end of paving. Send compaction results to Joshua.garcia@tucsonaz.gov | |
| 05/18/2026 | ENGR Paving | Not Ready | Compaction tests haven’t been done yet but it looks. It appears to be good. Handicap parking slope needs to be adjusted and crosswalk slope in front of the rollup doors into the building. I’ll come in the morning as asphalt is scheduled to arrive at 9 o’clock. fix areas that we discussed. | |
| 05/19/2026 | ENGR Paving | Partial Pass | Addressed a couple problem areas. Handicap area complies and area of potential puddling at west center bullnose worked so that it drains correctly to 22nd. Density in AB complies. Okay to pave 3" AC. |
|
| 05/20/2026 | ENGR Paving | Passed |