Permit Details

Status:
Fees Paid
Type:
Development Package
Address:
5 S HOUGHTON RD
Address NEW:
5 S HOUGHTON RD
Apply Date:
05/21/2025
Applicant:
Andrew Diller
Description:
Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.

Permit Reviews

Permit Number - TD-DEV-0525-00144
Permit Status: Fees paid
Permit Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Start Date Submittal Complete Date Status  
05/22/2025 DEVELOPMENT PACKAGE NEW v.1 06/03/2025 REQUIRES RESUBMIT Review Details
04/08/2026 AS-BUILT v.2 04/16/2026 APPROVED Review Details
09/03/2025 DEVELOPMENT PACKAGE NEW v.3 10/06/2025 REQUIRES RESUBMIT Review Details
01/23/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 01/23/2026 REQUIRES RESUBMIT Review Details
04/08/2026 AS-BUILT v.1 04/08/2026 REQUIRES RESUBMIT Review Details
10/09/2025 DEVELOPMENT PACKAGE NEW v.4 11/04/2025 APPROVED Review Details
01/26/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 02/20/2026 APPROVED Review Details
06/11/2025 DEVELOPMENT PACKAGE NEW v.2 07/14/2025 REQUIRES RESUBMIT Review Details
06/29/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 07/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0525-00144
Permit Status: Fees paid
Permit Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Total Outstanding Activity Conditions - 1
Date Name
03/17/2026 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: TD-DEV-0525-00144
Permite Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
09/09/2026 Final inspection to ensure all landscape and water harvesting SITE N/A Re-inspection required 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site.

Punch list:

-Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete.
-Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete.
-Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations.
09/09/2026 ENGR Engineering Final N/A Re-inspection required Address landscaping comments.
09/09/2026 LAND Landscape Appearance & Function Final N/A Re-inspection required 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site.

Punch list:

-Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete.
-Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete.
-Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations.
09/09/2026 N/A Re-inspection required 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site.

Punch list:

-Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete.
-Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete.
-Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations.
09/09/2026 N/A Re-inspection required 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site.

Punch list:

-Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete.
-Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete.
-Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations.

Completed Inspections

Permit Status: Fees Paid
Permit Number: TD-DEV-0525-00144
Permit Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Total Completed Inspections - 12
Date Description Inspector Results Comments
01/23/2026 PDSD Engineering Division Pre-Construction SITE Passed On-site meeting to discuss development package expectations.
01/26/2026 SITE - Stormwater Setup and Controls Passed All necessary SWPPP devices are in place, stormwater controls are effective following recent rainfall.
06/17/2026 Consultation SITE Passed Discussed timing of next concrete pour (Tuesday June 23, 3am), call in inspection for Monday prior.
07/09/2026 ENGR - Drainage Structures Passed Stormdrain connections (4) from East canopy posts to 8" underground drainpipe is good. Okay to backfill.
07/09/2026 Passed 7/8/26 - Site walls are complete. Grouted rip-rap along South (existing) retaining wall is all that remains.
07/09/2026 For trash and recycling enclosures Passed Refuse enclosure is complete in accordance with approved plans.
07/09/2026 Passed All initial grading is complete.
07/13/2026 Passed Concrete driveway under canopy: reinforcement, subgrade, and thickness are good. Okay to pour.
07/22/2026 ENGR Grading Final Passed
07/27/2026 Passed Underground electrical for two (2) light poles: Conduit at required depth with marking tape. Okay to pour pole base.
09/09/2026 SITE - Zoning Final Passed No rezoning requirements listed on DP
09/09/2026 Passed

Documents

File Name Document Type  
1-DEVELOPMENT PACKAGE - REVISION 3_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
REVISION 1 - APPROVED - 1-DEVELOPMENT PACKAGE - REVISION 1_V2 - STAMPED 02.20.2026.PDF DOCUMENTS VIEW
APPROVED - 1-DEVELOPMENT PACKAGE_V4 - STAMPED 11.04.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20260105_135543.PDF DOCUMENTS VIEW
1-SOILS GEOTECH REPORT_V1_V2.PDF DOCUMENTS VIEW
1-SWPPP_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW