Permit: TD-DEV-0525-00144
Permit Details
Apply Date:
05/21/2025
Applicant:
Andrew Diller
Description:
Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Permit Reviews
Permit Number - TD-DEV-0525-00144
Permit Status: Fees paid
Permit Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2025 | DEVELOPMENT PACKAGE NEW v.1 | 06/03/2025 | REQUIRES RESUBMIT |
| 04/08/2026 | AS-BUILT v.2 | 04/16/2026 | APPROVED |
| 09/03/2025 | DEVELOPMENT PACKAGE NEW v.3 | 10/06/2025 | REQUIRES RESUBMIT |
| 01/23/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/23/2026 | REQUIRES RESUBMIT |
| 04/08/2026 | AS-BUILT v.1 | 04/08/2026 | REQUIRES RESUBMIT |
| 10/09/2025 | DEVELOPMENT PACKAGE NEW v.4 | 11/04/2025 | APPROVED |
| 01/26/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/20/2026 | APPROVED |
| 06/11/2025 | DEVELOPMENT PACKAGE NEW v.2 | 07/14/2025 | REQUIRES RESUBMIT |
| 06/29/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 07/30/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-0525-00144
Permit Status: Fees paid
Permit Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/17/2026 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Fees Paid
Permit Number: TD-DEV-0525-00144
Permite Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2026 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Re-inspection required | 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site. Punch list: -Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete. -Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete. -Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations. |
| 09/09/2026 | ENGR Engineering Final | N/A | Re-inspection required | Address landscaping comments. |
| 09/09/2026 | LAND Landscape Appearance & Function Final | N/A | Re-inspection required | 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site. Punch list: -Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete. -Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete. -Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations. |
| 09/09/2026 | N/A | Re-inspection required | 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site. Punch list: -Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete. -Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete. -Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations. |
|
| 09/09/2026 | N/A | Re-inspection required | 9.9.2026 Site landscape site inspection completed. See plan mark up complete on site. Punch list: -Replace dead plants per the the plan mark up and provide photo documentation once the installation is complete. -Replace all missing plants per the plan mark up and provide photo documentation once the installation is complete. -Irrigation contractor to verify irrigation functionality. At time of inspection some of the emitters were not producing a drip. Contractor to flush the system and send photo documentation/verification that the system is functioning at plant material locations. |
Completed Inspections
Permit Status: Fees Paid
Permit Number: TD-DEV-0525-00144
Permit Description: Rev 2 - update to water/meter, started 06.29.2026 ** Rev 1 - update to sewer, concrete landing/sidewalk, landscaping, started 01.23.2026 ** Construction of a carwash on a commercial lot within the Silverado Plaza shopping mall.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | On-site meeting to discuss development package expectations. | |
| 01/26/2026 | SITE - Stormwater Setup and Controls | Passed | All necessary SWPPP devices are in place, stormwater controls are effective following recent rainfall. | |
| 06/17/2026 | Consultation SITE | Passed | Discussed timing of next concrete pour (Tuesday June 23, 3am), call in inspection for Monday prior. | |
| 07/09/2026 | ENGR - Drainage Structures | Passed | Stormdrain connections (4) from East canopy posts to 8" underground drainpipe is good. Okay to backfill. | |
| 07/09/2026 | Passed | 7/8/26 - Site walls are complete. Grouted rip-rap along South (existing) retaining wall is all that remains. | ||
| 07/09/2026 | For trash and recycling enclosures | Passed | Refuse enclosure is complete in accordance with approved plans. | |
| 07/09/2026 | Passed | All initial grading is complete. | ||
| 07/13/2026 | Passed | Concrete driveway under canopy: reinforcement, subgrade, and thickness are good. Okay to pour. | ||
| 07/22/2026 | ENGR Grading Final | Passed | ||
| 07/27/2026 | Passed | Underground electrical for two (2) light poles: Conduit at required depth with marking tape. Okay to pour pole base. | ||
| 09/09/2026 | SITE - Zoning Final | Passed | No rezoning requirements listed on DP | |
| 09/09/2026 | Passed |