Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | ENGR - Drainage Structures | Partial Pass | 6" stormdrain pipe on East side of building from 'tunnel entrance' up to and including 'catch basin 2' is set and sloped correct. Okay to backfill. | |
| 04/08/2026 | ENGR - Drainage Structures | Partial Pass | 12" stormdrain pipe on East side of building from previous to water harvesting basin is set and sloped correct. Okay to backfill. 6" stormdrain pipe on North side of building from trench drain to water harvesting basin is set and sloped correct. Okay to backfill. |
|
| 06/02/2026 | ENGR - Drainage Structures | Partial Pass | 46 lf of 12" stormdrain pipe from CB-1 to existing water harvesting area on west side: set and sloped correct, okay to backfill. | |
| 06/17/2026 | ENGR - Drainage Structures | Partial Pass | Catchbasin-1 is set and connected correctly, okay to backfill. | |
| 06/24/2026 | ENGR - Drainage Structures | Partial Pass | Trench drain at south entrance is sloped and connected correctly. Okay to encase. | |
| 07/09/2026 | ENGR - Drainage Structures | Passed | Stormdrain connections (4) from East canopy posts to 8" underground drainpipe is good. Okay to backfill. |