Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0525-00144

Parcel: 13338005F


Addresses:

5 S HOUGHTON RD

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
04/03/2026 ENGR - Drainage Structures Partial Pass 6" stormdrain pipe on East side of building from 'tunnel entrance' up to and including 'catch basin 2' is set and sloped correct. Okay to backfill.
04/08/2026 ENGR - Drainage Structures Partial Pass 12" stormdrain pipe on East side of building from previous to water harvesting basin is set and sloped correct. Okay to backfill.
6" stormdrain pipe on North side of building from trench drain to water harvesting basin is set and sloped correct. Okay to backfill.