Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | ENGR - Drainage Structures | Partial Pass | 6" stormdrain pipe on East side of building from 'tunnel entrance' up to and including 'catch basin 2' is set and sloped correct. Okay to backfill. | |
| 04/08/2026 | ENGR - Drainage Structures | Partial Pass | 12" stormdrain pipe on East side of building from previous to water harvesting basin is set and sloped correct. Okay to backfill. 6" stormdrain pipe on North side of building from trench drain to water harvesting basin is set and sloped correct. Okay to backfill. |