Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
7150 E SPEEDWAY BL
Apply Date:
05/02/2024
Applicant:
Dave Nanney
Description:
PROJECT INCLUDES THE CONSTRUCTION OF A NEW FUEL STATION WITH 10 FUELING POSITIONS AND A 1,440 S.F. CONVENIENCE STORE WITHIN THE EXISTING PARKING LOT OF A WALMART SUPERCENTER.

Permit Reviews

Permit Number - TD-DEV-0524-00143
Permit Status: Complete
Permit Description: PROJECT INCLUDES THE CONSTRUCTION OF A NEW FUEL STATION WITH 10 FUELING POSITIONS AND A 1,440 S.F. CONVENIENCE STORE WITHIN THE EXISTING PARKING LOT OF A WALMART SUPERCENTER.
Start Date Submittal Complete Date Status  
08/17/2024 DEVELOPMENT PACKAGE NEW v.4 10/18/2024 APPROVED Review Details
05/30/2024 DEVELOPMENT PACKAGE NEW v.2 07/03/2024 REQUIRES RESUBMIT Review Details
05/14/2024 DEVELOPMENT PACKAGE NEW v.1 05/22/2024 REQUIRES RESUBMIT Review Details
07/09/2024 DEVELOPMENT PACKAGE NEW v.3 08/14/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0524-00143
Permite Description: PROJECT INCLUDES THE CONSTRUCTION OF A NEW FUEL STATION WITH 10 FUELING POSITIONS AND A 1,440 S.F. CONVENIENCE STORE WITHIN THE EXISTING PARKING LOT OF A WALMART SUPERCENTER.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
04/02/2025 ENGR - Drainage Structures N/A Partial Pass Contractor is placing steel for the floor with the trash enclosures. They said the steel at 24 inch center but it needs to be on one foot center contractor send me a picture of when uncorrected. My contractor also showed me the connection from the storm and dragging underneath the canopy to the main drain.
05/12/2025 ENGR Paving N/A Partial Pass contractor has not finished cutting. The final grade for paving
05/13/2025 N/A Partial Pass contractor still working to install the irrigation lines and the plants
05/22/2025 N/A Partial Pass good for T C of O level four

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0524-00143
Permit Description: PROJECT INCLUDES THE CONSTRUCTION OF A NEW FUEL STATION WITH 10 FUELING POSITIONS AND A 1,440 S.F. CONVENIENCE STORE WITHIN THE EXISTING PARKING LOT OF A WALMART SUPERCENTER.
Total Completed Inspections - 8
Date Description Inspector Results Comments
03/11/2025 PDSD Engineering Division Pre-Construction SITE Passed For the contractor he needed all third-party testing on site. Also informed the contractor he needed to put three rebar vertically on the corners and two on the ends and the double takes two in the center. Call him for swipe every two weeks.
04/28/2025 Passed
04/28/2025 For trash and recycling enclosures Passed
04/28/2025 Passed
05/12/2025 Passed
05/19/2025 SITE - Stormwater Final Inspection Passed
06/04/2025 ENGR Engineering Final Passed
07/08/2025 LAND Landscape Appearance & Function Final Passed

Documents

File Name Document Type  
4_WM FUEL TUCSON 1291 CD SET_V4 (3) APPROVED.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW