Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Failed
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 03/13/2025 |
ENGR - Drainage Structures |
|
Failed |
The 42 inch manhole number one failed. It’s bus the bus well-being installed. The other two drainage structures are good. |
| 03/18/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
The manhole was replaced because the other manhole that they installed was damage that’s good the backfield |
| 03/26/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Installed storm drain line underneath the gas pump canopy. It’s good to backfill. |
| 04/02/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor is placing steel for the floor with the trash enclosures. They said the steel at 24 inch center but it needs to be on one foot center contractor send me a picture of when uncorrected. My contractor also showed me the connection from the storm and dragging underneath the canopy to the main drain. |