Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-0524-00143
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | For the contractor he needed all third-party testing on site. Also informed the contractor he needed to put three rebar vertically on the corners and two on the ends and the double takes two in the center. Call him for swipe every two weeks. |