Permit Details

Status:
Issued
Type:
Development Package
Address:
7157 S SWAN RD
Apply Date:
05/03/2023
Applicant:
Joshua Shearman
Description:
SAIA Motor Freight Lines, LLC is proposing to construct a new trucking freight facility on an undeveloped property located along S Swan Road in the City of Tucson, Pima County, AZ. The project involves clearing and grubbing, site grading, building construction, construction of access drives and parking areas, installation of site utilities, stormwater detention and conveyance systems, and other miscellaneous site improvements.

Permit Reviews

Permit Number - TD-DEV-0523-00230
Permit Status: Issued
Permit Description: SAIA Motor Freight Lines, LLC is proposing to construct a new trucking freight facility on an undeveloped property located along S Swan Road in the City of Tucson, Pima County, AZ. The project involves clearing and grubbing, site grading, building construction, construction of access drives and parking areas, installation of site utilities, stormwater detention and conveyance systems, and other miscellaneous site improvements.
Start Date Submittal Complete Date Status  
07/10/2023 DEVELOPMENT PACKAGE REVIEW v.2 08/09/2023 REQUIRES RESUBMIT Review Details
05/01/2024 DEVELOPMENT PACKAGE NEW v.3 06/01/2024 APPROVED Review Details
11/04/2023 DEVELOPMENT PACKAGE NEW v.1 12/13/2023 REQUIRES RESUBMIT Review Details
01/11/2024 DEVELOPMENT PACKAGE NEW v.2 02/09/2024 REQUIRES RESUBMIT Review Details
05/04/2023 DEVELOPMENT PACKAGE REVIEW v.1 05/05/2023 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0523-00230
Permit Description: SAIA Motor Freight Lines, LLC is proposing to construct a new trucking freight facility on an undeveloped property located along S Swan Road in the City of Tucson, Pima County, AZ. The project involves clearing and grubbing, site grading, building construction, construction of access drives and parking areas, installation of site utilities, stormwater detention and conveyance systems, and other miscellaneous site improvements.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/27/2024 PDSD Engineering Division Pre-Construction SITE Passed
07/09/2024 NPPO Pre-Construction Passed Met with the contractor on site for the pre-coming informed him he has to build this according to plan
08/15/2024 SITE - Stormwater Setup and Controls Passed