Inspection Status: Complete (Recurring)
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/07/2025 |
ENGR - Drainage Structures |
|
Complete (Recurring) |
All rebar and ties are placed according to plans 01/07/25 |
| 02/20/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
6 bottoms have been looked at and good to pour |
| 02/24/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
2 structures at the north gate area are good to pour, 02/25/25. |
| 02/27/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Two structures and 2 basses are good to pour at the north west end of the project, 02/27/25. |
| 03/04/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
|
| 03/06/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
2 structures at the north gate area are good to pour, 02/25/25. South west side are good to pour 3/4/25, two structures one south of building and one north of building, good to pour 03/06/25. |
| 12/13/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Footing for left front side drainage structure look good 12/13/2024 |
| 12/19/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Footing passed 12/18/24 |