Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - TD-DEV-0523-00230
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns | |
| 01/30/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
| 02/20/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No issues at this time | |
| 03/19/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | By weekly completed and looked at the bore for the flag pole at the same time. | |
| 04/30/2025 | SITE - Stormwater Follow-up | Passed | ||
| 05/14/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No Concerns at this time | |
| 06/24/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | NO Issues | |
| 07/25/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | 7/25/25 New wattle needs to be placed at the NW corner of site and any other areas where is being overtopped and is not functioning as designed. The Nursery area and the area around the outlet structure of Basin at NW of site needs corrective action. Also the North property line needs to be checked for areas that need to be repaired. Follow detail in SWPPP plan for correct overlapping and staking. All in structures and Catch basins that have potential for water ingress also need to be protected per SWPPP plan. Follow details in Plan. Site will need to be reinspected before contractor is pulled off site for extended period. |
|
| 10/02/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | There has been no rainfall now in several weeks. NPPO looks good and site has and is being maintained. | |
| 11/08/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No issues | |
| 12/09/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concernes at this time |