Permit Details

Status:
In Review
Type:
Development Package
Address NEW:
3838 N CAMPBELL AV
Apply Date:
04/13/2026
Applicant:
Laura Lohner
Description:
REV1: NEW PAVED SURFACE PARKING LOT

Permit Reviews

Permit Number - TD-DEV-0426-00092
Permit Status: In review
Permit Description: REV1: NEW PAVED SURFACE PARKING LOT
Start Date Submittal Complete Date Status  
04/14/2026 DEVELOPMENT PACKAGE NEW v.1 05/14/2026 REQUIRES RESUBMIT Review Details
09/15/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 09/22/2026 APPROVED Review Details
06/22/2026 DEVELOPMENT PACKAGE NEW v.2 08/24/2026 REQUIRES RESUBMIT Review Details
08/25/2026 DEVELOPMENT PACKAGE NEW v.3 08/31/2026 APPROVED Review Details

Conditions

Permit Number - TD-DEV-0426-00092
Permit Status: In review
Permit Description: REV1: NEW PAVED SURFACE PARKING LOT
Date Description Comments
07/14/2026 Zoning Approval Letter
08/31/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/31/2026 Pre-Issuance - Required Documents - Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's)

Outstanding Inspections

Permit Status: In Review
Permit Number: TD-DEV-0426-00092
Permite Description: REV1: NEW PAVED SURFACE PARKING LOT
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/13/2026 N/A Partial Pass 4" PVC sleeves under paving/curbs is substantially all installed except for mainline where it goes under hardscape. These sleeves per plan are 2x the sum of pipes/wire diameter. If this is not the case more and/or bigger sleeves will need to be installed. Okay to backfill these sleeves as appropriate. Mainline will need to be pressure tested, when ready schedule inspection. Schedule inspection for irrigation trenching as well prior to backfilling.
N/A Scheduled

Completed Inspections

Permit Status: In Review
Permit Number: TD-DEV-0426-00092
Permit Description: REV1: NEW PAVED SURFACE PARKING LOT
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/10/2026 PDSD Engineering Division Pre-Construction SITE Passed Schedule SWPPP and NPPO inspections
Inspections needed:
Grading
Paving
Striping
Signage
Sidewalk/flat work
Landscape irrigation
Drain pipe
Landscape, final appearance and function
Engineering final
Site consultation
SWPPP Biweekly
09/21/2026 SITE - Stormwater Setup and Controls Passed -Wattle-add stakes as discussed with contractors
-Filter fabric under inlet grates off site. Site has curb and wattle in place for protection. If necessary it will be put in place (not needed now but will monitor)
-Construction entrance-Rail shaker at entrance on Allen.
10/08/2026 NPPO Pre-Construction Passed

Scheduled Inspections

Scheduled Inspections - TD-DEV-0426-00092
Status: In Review
Description: REV1: NEW PAVED SURFACE PARKING LOT
Scheduled Date Description Entered By Entered Date
11/24/2026 Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
25035.00_BUMCT NORTH PARKING LOT_DP SEALED (2026 09 14) DP MOD-H1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
PLAN SET-25035.00_BUMCT NORTH PARKING LOT_DP SEALED (2026 08 11) 2ND SUBMITTAL R1-A3_V3.PDF DOCUMENTS VIEW