Permit Number: TD-DEV-0426-00092
Parcel: 11202034L

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0426-00092
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/12/2026 NPPO Standard APPROVED NPPO is not required for this existing site.

Thank you.
Chad Keller, PLA
chad.keller@tucsonaz.gov
05/12/2026 Entitlements Standard REQUIRES RESUBMIT Modification TP-MOD-0426-000048 pending completion, resubmit with decision letter when available.
04/29/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0426-00092 (1st Review)
Project: NEW PAVED SURFACE PARKING LOT
Location: 3838 N CAMPBELL AV
Review Date: 4/24/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering

*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Review Comments:
1. Provide the development package case number, TD-DEV-0426-00092, adjacent to the title block on all sheets
2. Provide the page number and total number of pages within the DP (i.e., sheet xx of xx) AD 2-06.4.2. D. This should be progressive on each sheet of the plan set.
3. In reference to keynote #25 “covered parking” on the site plan (Sheet CS101) - To review for compliance with UDC 7.4.6.F.2 & UDC 7.4.6.E.2. It is required that the required the canopy either follow the required height clearance of 15 – feet along the PAAL or be setback one foot or greater from the PAAL. Provide a height call-out showing the clearance OR show on the site plan that the 1-foot setback is addressed. Provide a construction detail for the canopy and ensure to demonstrate referenced compliance. Ensure this is demonstrated for the Development Package (Site Plan) submission and the subsequent commercial building permit submission
4. Wheels stops will be required for the two parking spaces directly above (North) of the ADA parking spaces.
5. Provide clarification on the intention of the proposed gate as referenced by keynote #28 on sheet CS101.
6. Show/delineate the proposed curb cuts/openings on the grading and drainage plan (Sheet CG101) as they are shown on the site plan (Sheet CS101).
7. Include spot elevations at curb cut inlets and curb cut outlets for quick reference during site inspections.
8. Revise the curb radii’ at all associated PAAL intersections to be in compliance with UDC 7.4.6.E.1.a. 5-foot radius in the minimum.

If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
05/13/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW PAVED SURFACE PARKING LOT
ACTIVITY NO: TD-DEV-0426-00092
ADDRESS: 3838 N CAMPBELL AV
RELATED PRE APPLICATION CONFERENCE NO: TP-PRE-0126-00012
ZONING: PAD-11 UMC NORTH PAD
LAND USE: PARKING AREA
5.13.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Per Entitlements review, this proposal will need to submit the approved Modification Request TP-MOD-0426-000048 with the next submittal of this development package as part of the approval process. The Healing Garden is part of this modification request, and it is stated that the Healing Garden will be implemented as part of a future phase of this PAD.

2. Grading and Drainage Note no. 6 on sheet CG101 it is stated that the landscape planting areas are to be depressed a minimum of 3 inches. Add a max of 9 inches to the callout for clarity. Make sure the Grading Note no. 6 and Landscape Note no. 9 on sheet LP-001 are consistent. Any depressed planting area receiving drainage deeper than 9 inches requires infiltration testing.

3. Add a general note to the planting plan to see the civil grading plan for planting area spot elevations and direct the contractor to detail 2 on sheet LP-502 Rainwater Harvesting Basin at Parking Islands and detail 2 on sheet CS502 for the Tree Well Detail.

4. Can the NPPO legend symbols for PIP, RFS and TOS on sheet LP-101 be turned gray to match the planting plan so that there is no question for the contractor what your placement intentions are. Possibly add a bold note under the legend to see planting plan for symbol and transplant number locations.

5. Is there a location on site that would be best for the temporary nursery for the transplants. Discuss project construction phasing with the civil engineer to select a place out of the way near a water source for the salvage plants and show it on the plan with a note.

6. Update the Root Barrier detail name to state “near hardscape and utility lines”.

7. Prior to site landscape approval, ensure that Site Zoning and Site Engineering comments are fully addressed.

8. Include the Activity Number TD-DEV-0426-00092 on all sheets in the plan set.

Thank you.
Chad Keller, PLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
05/13/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
New Paved Parking Lot - 3838 N. Campbell Ave. Tucson, AZ 85719
Development Package (1st Review)
TD-DEV-0426-00092

TRANSMITTAL DATE: 5/13/26
DUE DATE: 5/11/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 20, 2027.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.3.0 FORMAT REQUIREMENTS

CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx).

1. COMMENT: 2-06.4.2.D – Please provide the page number and total number of pages as noted by the standard above.

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0426-00092, adjacent to the title block on each sheet.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any.

3. COMMENT: 2-06.4.7.A.6.a – As a modification has been requested to the PAD-11 document, please include TP-MOD-0426-000048 in the lower right corner and if applicable, any associated approval conditions.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

4. COMMENT: 2-06.4.9.H.5 – As a new covered parking structure is proposed, please demonstrate compliance with UDC 7.4.6.E.2 and 7.4.6.F.2 as noted by the standard above.

2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

5. COMMENT: 2-06.4.9.H.5.a – Please include the required EVSE calculations and designated parking spaces. Per UDC Table 7.4.11-1, the required number of EVSE are 5% EV Ready and 15% EV Capable. Also, please include wheel stops on the spaces adjacent to the pedestrian walkway located north of the proposed ADA parking spaces.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

6. COMMENT: 2-06.4.9.Q – Please provide the square footage and height of the proposed parking canopy as noted by the standard above.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations ***

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
04/14/2026 CDRC Application Completeness Express REVIEW COMPLETED
04/20/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Parks, Entitlements, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Parks and TEP. FYI email sent to PAG, USPS, SWG.
05/08/2026 Commercial Plumbing Standard REVIEW COMPLETED
04/23/2026 External Reviewers - COT Parks & Recreation Standard REVIEW COMPLETED CDRC,



Approved



Regarding TD-DEV-0426-00092, The City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required.



Parcel: 11202034L



Regards,



Joe Barr

Project Manager

Tucson Parks and Recreation

520-307-2811
04/20/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
04/20/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
05/12/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED May 8, 2026
WO#T182436
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject:
BANNER UMC NORTH SURFACE PARKING LOT
TD-DEV-0426-00092
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 4/20/2026. There are existing facilities within the development which are
depicted upon the plan. There are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
Questions regarding Land, ROW, Easement, etc., please contact the TEP Land
Department
Liz Boehler
Right of Way Agent
Consultant
520-686-1341
Landreviews@tep.com
Should you have any technical questions, please contact the area designer,
Chuck Leon
(520) 400-6133
cleon@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
04/20/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
05/12/2026 Fire New Construction Standard REVIEW COMPLETED
04/14/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
04/20/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
05/14/2026 ROW Engineering Review Standard REVIEW COMPLETED ROW permit required prior to working in the ROW for the stabilized construction entrance.
04/22/2026 ROW Review REVIEW COMPLETED