Permit Details

Status:
Complete
Type:
Development Package
Address:
2540 E 10TH ST
Apply Date:
04/07/2023
Applicant:
Lucas Trautman
Description:
*Revision #2 (GFA update) started 5/14/2024.* *Revision #1 started 2/28/24* Solot Redevelopment

Permit Reviews

Permit Number - TD-DEV-0423-00202
Permit Status: Complete
Permit Description: *Revision #2 (GFA update) started 5/14/2024.* *Revision #1 started 2/28/24* Solot Redevelopment
Start Date Submittal Complete Date Status  
06/16/2023 DEVELOPMENT PACKAGE NEW v.1 07/07/2023 REQUIRES RESUBMIT Review Details
05/14/2024 DEVELOPMENT PACKAGE NEW v.1 05/30/2024 REQUIRES RESUBMIT Review Details
08/18/2023 DEVELOPMENT PACKAGE NEW v.2 09/29/2023 REQUIRES RESUBMIT Review Details
04/10/2023 DEVELOPMENT PACKAGE REVIEW v.1 06/05/2023 REQUIRES RESUBMIT Review Details
02/28/2024 DEVELOPMENT PACKAGE REVIEW v.1 04/09/2024 APPROVED Review Details
06/28/2024 DEVELOPMENT PACKAGE NEW v.2 06/28/2024 APPROVED Review Details
11/09/2023 DEVELOPMENT PACKAGE NEW v.3 11/30/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0423-00202
Permite Description: *Revision #2 (GFA update) started 5/14/2024.* *Revision #1 started 2/28/24* Solot Redevelopment
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
03/19/2024 SITE N/A Not Ready
03/19/2024 SITE - Stormwater Follow-up N/A Partial Pass Project access is to dirt alley. No concerns at this time schedule inspections biweekly.
03/19/2024 PDSD Engineering Division Pre-Construction SITE N/A Partial Pass Lucas
03/20/2024 SITE - Stormwater Setup and Controls N/A Not Ready Provide controls as needed
07/15/2024 COT - ENGR - Stormwater N/A Partial Pass construction still in progress
04/11/2024 ENGR - Drainage Structures N/A Partial Pass Sub had a question on the drainage scupper going through the ada ramp from downspout to parking lot. Scupper will be flush with top of concrete and drain into the parking lot at the parking space not in the pedestrian/ada walkway. APPROVED TO DO.
03/20/2024 Final inspection to ensure all landscape and water harvesting SITE N/A Partial Pass
08/29/2024 SITE - Stormwater Final Inspection N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0423-00202
Permit Description: *Revision #2 (GFA update) started 5/14/2024.* *Revision #1 started 2/28/24* Solot Redevelopment
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/20/2024 PDSD Site/Engineering Division - NPPO Passed
08/29/2024 COT - ENGR - Signage Final Passed
08/29/2024 ENGR Engineering Final Passed Ready for CO

SECTION307
HANDRAILS AND GUARDRAILS
307.1General.
Every exterior and interior flight of stairs having more than four risers shall have a handrail on one side of the stair and every open portion of a stair, landing, balcony, porch, deck, ramp or other walking surface that is more than 30 inches (762 mm) above the floor or grade below shall have guards. Handrails shall be not less than 30 inches (762 mm) in height or more than 42 inches (1067 mm) in height measured vertically above the nosing of the tread or above the finished floor of the landing or walking surfaces. Guards shall be not less than 30 inches (762 mm) in height above the floor of the landing, balcony, porch, deck, or ramp or other walking surface.
08/29/2024 Final inspection to ensure all landscape and water harvesting SITE Passed

Documents

File Name Document Type  
APPROVED 2_R2-TD-DEV-0423-00202-SOLOT_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SOLOT DRAINAGE REPORT 2023-04-07_V1.PDF DOCUMENTS VIEW
FUGITIVE DUST ACTIVITY PERMIT - PIMA COUNTY_V1.PDF DOCUMENTS VIEW