Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2024 | ENGR - Drainage Structures | Not Ready | provide history for footing inspection. Provide vertical rebar and bond beam per international building code requirements. Install cleanouts for visual inspection of grout. Superintendent Lucas, please schedule inspections as required from development package permit |
|
03/20/2024 | ENGR - Drainage Structures | Partial Pass | Pre-grout, trash enclosure | |
03/25/2024 | ENGR - Drainage Structures | Partial Pass | built according to plans not COT code. | |
03/26/2024 | ENGR - Drainage Structures | Not Ready | double solid waste enclosure is approx. 4 feet too narrow. discussed with project supervisor that a communication from ES to PDS THAT THIS ENCLOSURE IS ACCETABLE AS CONSTRUCTED. | |
04/04/2024 | ENGR - Drainage Structures | Partial Pass | Lucas has documentation allowing trash enclosure discrepancy. Please provide to Inspector prior to final. | |
04/11/2024 | ENGR - Drainage Structures | Partial Pass | Sub had a question on the drainage scupper going through the ada ramp from downspout to parking lot. Scupper will be flush with top of concrete and drain into the parking lot at the parking space not in the pedestrian/ada walkway. APPROVED TO DO. | |
05/20/2024 | ENGR - Drainage Structures | Partial Pass | ||
08/01/2024 | ENGR - Drainage Structures | Partial Pass | See notes below |