Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address:
2000 N 4TH AV
Address NEW:
2000 N 4TH AV
Apply Date:
03/06/2026
Applicant:
Rebeca Field
Description:
Restricted Record ** Construction of new green stormwater infrastructure features and parking lot improvements.

Permit Reviews

Permit Number - TD-DEV-0326-00059
Permit Status: Inspections
Permit Description: Restricted Record ** Construction of new green stormwater infrastructure features and parking lot improvements.
Start Date Submittal Complete Date Status  
03/06/2026 DEVELOPMENT PACKAGE NEW v.1 03/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0326-00059
Permit Status: Inspections
Permit Description: Restricted Record ** Construction of new green stormwater infrastructure features and parking lot improvements.
Total Outstanding Activity Conditions - 1
Date Name
03/13/2026 Prior to Final documents, fees and contractor

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0326-00059
Permite Description: Restricted Record ** Construction of new green stormwater infrastructure features and parking lot improvements.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/03/2026 N/A Canceled
06/03/2026 Consultation SITE N/A Partial Pass Discussion about PAG Type 1 scupper in Stabilized DG On west end of site and the Type 2 that needed to be fixed. Contractor's plans were sound. Send pictures of work before pour.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0326-00059
Permit Description: Restricted Record ** Construction of new green stormwater infrastructure features and parking lot improvements.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/06/2026 PDSD Engineering Division Pre-Construction SITE Passed 4/6/26
Okay to pour south sidewalk per PAG 200. Use expansion material no less than 40' and at cold joints. Okay to pour mow stop header.
Schedule Inspections for Paving/Flatwork including before pouring scuppers and curb ramps. Schedule inspections for paving, landscape irrigation, water harvesting, striping and signage. when ready.