Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 4/6/26 Okay to pour south sidewalk per PAG 200. Use expansion material no less than 40' and at cold joints. Okay to pour mow stop header. Schedule Inspections for Paving/Flatwork including before pouring scuppers and curb ramps. Schedule inspections for paving, landscape irrigation, water harvesting, striping and signage. when ready. |