Permit Details

Status:
Inspections
Type:
Development Package
Address NEW:
5950 E BROADWAY BL
Apply Date:
03/21/2025
Applicant:
Allison Reis
Description:
Rev 1 - update to trash enclosure, curb, use from retail to food service - started 05.01.2026 ** Change of use and added patio

Permit Reviews

Permit Number - TD-DEV-0325-00090
Permit Status: Inspections
Permit Description: Rev 1 - update to trash enclosure, curb, use from retail to food service - started 05.01.2026 ** Change of use and added patio
Start Date Submittal Complete Date Status  
03/24/2025 DEVELOPMENT PACKAGE NEW v.1 05/13/2025 REQUIRES RESUBMIT Review Details
12/24/2025 DEVELOPMENT PACKAGE NEW v.4 12/31/2025 APPROVED Review Details
05/01/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 05/29/2026 REQUIRES RESUBMIT Review Details
12/01/2025 DEVELOPMENT PACKAGE NEW v.3 12/22/2025 REQUIRES RESUBMIT Review Details
10/29/2025 DEVELOPMENT PACKAGE NEW v.2 11/21/2025 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0325-00090
Permit Description: Rev 1 - update to trash enclosure, curb, use from retail to food service - started 05.01.2026 ** Change of use and added patio
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/26/2026 PDSD Engineering Division Pre-Construction SITE Passed Pre-construction meeting held on-site. Primary scope is for refuse enclosures. Necessary inspections listed below.
Refuse Enclosure: for slab/approach rebar, wall footing, wall pre-grout, finish condition
Sidewalk/Flatwork: for any sidewalk or concrete work that may come up
Site Consultation: for general questions or concerns
Engineering Final: final inspection once development package work is complete
08/31/2026 For trash and recycling enclosures Passed Pending approval of Revision showing shift in location.