Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2026 | For trash and recycling enclosures | Partial Pass | 7/2/26 - ! Refuse enclosure location has been changed from original approved plans, new location is still in the revision process, proceed at-risk until revision is approved ! Two (2) refuse enclosure footings: dimensions and reinforcement are correct, see note above concerning location. Pour at-risk pending revision approval. |
|
| 07/15/2026 | For trash and recycling enclosures | Partial Pass | Wall grout for two (2) refuse enclosures (location is currently at-risk pending revision): weep holes provided, reinforcement is good. Okay for grout full height of wall. | |
| For trash and recycling enclosures | Scheduled |