Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-construction meeting held on-site. Primary scope is for refuse enclosures. Necessary inspections listed below. Refuse Enclosure: for slab/approach rebar, wall footing, wall pre-grout, finish condition Sidewalk/Flatwork: for any sidewalk or concrete work that may come up Site Consultation: for general questions or concerns Engineering Final: final inspection once development package work is complete |