Permit Details

Status:
Approved - Awaiting Customer Attention
Type:
Development Package
Address NEW:
8650 S ALVERNON WY
Apply Date:
03/07/2025
Applicant:
Blake Junak
Description:
Restricted-Revision 1-Two new concrete test pad areas for Raytheon

Permit Reviews

Permit Number - TD-DEV-0325-00075
Permit Status: Approved - awaiting customer attention
Permit Description: Restricted-Revision 1-Two new concrete test pad areas for Raytheon
Start Date Submittal Complete Date Status  
03/12/2025 DEVELOPMENT PACKAGE NEW v.1 05/12/2025 REQUIRES RESUBMIT Review Details
08/20/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 09/17/2026 APPROVED Review Details
02/24/2026 DEVELOPMENT PACKAGE NEW v.4 02/26/2026 APPROVED Review Details
06/26/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/26/2026 APPROVED Review Details
08/19/2025 DEVELOPMENT PACKAGE NEW v.2 09/30/2025 REQUIRES RESUBMIT Review Details
01/14/2026 DEVELOPMENT PACKAGE NEW v.3 02/06/2026 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Approved - Awaiting Customer Attention
Permit Number: TD-DEV-0325-00075
Permite Description: Restricted-Revision 1-Two new concrete test pad areas for Raytheon
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/21/2026 NPPO Pre-Construction N/A Partial Pass Please provide an as-built plan that indicates the approximate locations of the transplant and mitigation NPPO plants on other Raytheon properties. On the as-built drawing include a note that states how the plants are being watered and at what frequency. This can be compiled using aerial imagery and approximate locations of the salvage/transplant and mitigation plant material.
09/01/2026 ENGR Engineering Final N/A Partial Pass 9/1/26: OKAY TO REQUEST LEVEL 3 TCO (Submit generator plan sheets on building permit as a revision)

Completed Inspections

Permit Status: Approved - Awaiting Customer Attention
Permit Number: TD-DEV-0325-00075
Permit Description: Restricted-Revision 1-Two new concrete test pad areas for Raytheon
Total Completed Inspections - 1
Date Description Inspector Results Comments
05/14/2026 PDSD Engineering Division Pre-Construction SITE Passed Applicable inspections will be added to this development package. Rough Grading - Submit compaction testing results prior to AB installation. Sidewalks/flatwork for concrete flatwork other than slabs identified on COM permit. call in when AB installation is complete and compaction has been tested. Joshua Garcia 520-540-9896.