Inspection Status: Partial Pass
Inspection History: NPPO Pre-Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2026 |
NPPO Pre-Construction |
|
Partial Pass |
Please provide an as-built plan that indicates the approximate locations of the transplant and mitigation NPPO plants on other Raytheon properties. On the as-built drawing include a note that states how the plants are being watered and at what frequency. This can be compiled using aerial imagery and approximate locations of the salvage/transplant and mitigation plant material. |