Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/14/2026 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Applicable inspections will be added to this development package. Rough Grading - Submit compaction testing results prior to AB installation. Sidewalks/flatwork for concrete flatwork other than slabs identified on COM permit. call in when AB installation is complete and compaction has been tested. Joshua Garcia 520-540-9896. |