Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
5300 N VALLEY VIEW RD
Apply Date:
03/03/2025
Applicant:
Cary Broschat
Description:
Restricted Record: Installation of ground mounted PV solar system 1068.72 KW dc / 840 KW ac This is a City of Tucson Project

Permit Reviews

Permit Number - TD-DEV-0325-00067
Permit Status: Complete
Permit Description: Restricted Record: Installation of ground mounted PV solar system 1068.72 KW dc / 840 KW ac This is a City of Tucson Project
Start Date Submittal Complete Date Status  
03/06/2025 DEVELOPMENT PACKAGE NEW v.1 04/23/2025 REQUIRES RESUBMIT Review Details
05/27/2025 DEVELOPMENT PACKAGE NEW v.2 06/16/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0325-00067
Permite Description: Restricted Record: Installation of ground mounted PV solar system 1068.72 KW dc / 840 KW ac This is a City of Tucson Project
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/01/2025 N/A Not Ready 12/1/25
Channel erosion repair check dams are not continuous end to end. Remove dirt and fill with rock. Request same inspection when ready

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0325-00067
Permit Description: Restricted Record: Installation of ground mounted PV solar system 1068.72 KW dc / 840 KW ac This is a City of Tucson Project
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/20/2025 NPPO Pre-Construction Passed Walked the site with the contractor and all TOS and PIP plants have been re-tagged for clarity. Contractor is organized and taking great care with the Native Plant Preservation Ordinance plants.
10/20/2025 PDSD Engineering Division Pre-Construction SITE Passed
02/03/2026 Passed 2/3/26
Gravel filled wattles are made and placed per plan and detail in The Erosion Control Plan. The wattles every other row perpendicular to the slope per plan.
Schedule inspection when hydroseeding all disturbed areas is complete.
03/24/2026 ENGR Engineering Final Passed
03/24/2026 NPPO Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW