Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | Passed | 2/3/26 Gravel filled wattles are made and placed per plan and detail in The Erosion Control Plan. The wattles every other row perpendicular to the slope per plan. Schedule inspection when hydroseeding all disturbed areas is complete. |
||
| 10/31/2025 | Partial Pass | Overex of erosion repair beginning. call in weekly inspections to monitor progress. | ||
| 11/10/2025 | Partial Pass | Proceed with check dam installation. | ||
| 12/01/2025 | Not Ready | 12/1/25 Channel erosion repair check dams are not continuous end to end. Remove dirt and fill with rock. Request same inspection when ready |
||
| 12/09/2025 | Partial Pass | 12/9/25 South Slope Channel Erosion Repair and Check dams built to Engineers’s RFI specifications and plan. Filter Fabric used in check dams in addition to the Riprap filler in between. Secondary rills at the bottom of slope also repaired correct. Gravel Wattles will be placed when practical during array install. |