| 04/15/2025 | Commercial Plumbing Standard | APPROVED | |||
| 04/11/2025 | NPPO Standard | APPROVED | |||
| 04/11/2025 | Site Landscape Standard | NOT REQUIRED | |||
| 04/22/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 03/26/2025 | External Reviewers - Pima County Development Services Standard | REQUIRES RESUBMIT | Hi Hussein, Below are my comments. Mapped Regulated Riparian Habitat (RRH) impacts this parcel. The classification of RRH is Xeroriparian Class C Habitat (XC). Avoidance of the RRH is required. Disturbance to the RRH is calculated and when a 1/3 acre of RRH is disturbed, mitigation is required. Delineate the RRH boundary on the site plan and the NPPO plan, label as appropriate and identify in the legend. Please add the following General Notes to the plans: Total amount of regulated riparian habitat onsite: acres Amount of regulated riparian habitat disturbed onsite by this project: _____ acres Patricia Gilbert Hydrologist III Floodplain Management Division Pima County Regional Flood Control District 201 North Stone Ave 9th Floor Tucson, Arizona, 85701 Direct - 520.724.4606 | ||
| 04/22/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. If no site grading is anticipated, please provide more detail on how the arrays will be installed on the existing slopes without benching or grading. 2. Referring to the note on the Erosion Control Plan “Existing swale breach & breakout flow to be addressed by others under separate contract.” – The breach and breakout flow will need to be addressed prior to approval. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 03/06/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 03/19/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. Review request email sent to TEP. | ||
| 04/07/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | April 4, 2025 WO#T145496 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Valley View Reservoir TD-DEV-0325-00067 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 3/19/2025. There are existing facilities within the development which are not depicted upon the plan; however, there do not appear to be any apparent conflicts at this time. Further, please refer to attached Book 6838 Page 682 for existing facilities. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Chuck Leon (520) 400-6133 cleon@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 04/03/2025 | Fire New Construction Standard | REVIEW COMPLETED | project shall comply with Section 1204 of the 2018 IFC | ||
| 03/18/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 03/21/2025 | ROW Engineering Review Standard | REVIEW COMPLETED |