Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
8920 E WOODLAND RD
Apply Date:
03/22/2024
Applicant:
David Shambach
Description:
Minor site revision to add a 800 sf agriculture building to an existing agricultural commercial stable use

Permit Reviews

Permit Number - TD-DEV-0324-00099
Permit Status: Complete
Permit Description: Minor site revision to add a 800 sf agriculture building to an existing agricultural commercial stable use
Start Date Submittal Complete Date Status  
05/22/2024 DEVELOPMENT PACKAGE NEW v.2 06/17/2024 REQUIRES RESUBMIT Review Details
03/22/2024 DEVELOPMENT PACKAGE NEW v.1 05/08/2024 REQUIRES RESUBMIT Review Details
07/17/2024 DEVELOPMENT PACKAGE NEW v.3 02/21/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0324-00099
Permite Description: Minor site revision to add a 800 sf agriculture building to an existing agricultural commercial stable use
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/17/2026 N/A Partial Pass 3/17/26 Sidewalk and ramps -
Subgrade compacted. Forms are correct 5" concrete depth. Running slopes are less than 8.33% and cross slopes less than 2%. Landings less than 2% both ways. Okay to pour sidewalk and ramps.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0324-00099
Permit Description: Minor site revision to add a 800 sf agriculture building to an existing agricultural commercial stable use
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/10/2025 PDSD Engineering Division Pre-Construction SITE Passed 12/10/24
Just sidewalk and ramps. Flatwork/sidewalk inspection and Handrail inspection and a grading inspection to ensure drainage away from the building. It is in a flood plane next to the Rillito.
03/06/2026 Consultation SITE Passed 3/6/26
Slope for proposed ramp is compliant. Request sidewalk/flat work inspection before pouring ramp and other ramps below.
03/20/2026 Passed Ramp concrete finish condition is good. Ramp requires handrails, contractor to begin work on those next.
03/26/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.

Documents

File Name Document Type  
240715_23-006 -TROT_DEVELOPMENT PACKAGE_REV2_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MST-T BK 5752 PG 635-16' EASEMENT.PDF DOCUMENTS VIEW
REDLINE TROT.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW