Permit Number: TD-DEV-0324-00099
Parcel: 11450030A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0324-00099
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/30/2024 Commercial Plumbing APPROVED
04/29/2024 External Reviewers - Tucson Electric Power (TEP) APPROVED April 29, 2024 WO#T110893 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Therapeutic Riding of Tucson Tack Room TD-DEV-0324-00099 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 4/8/2024. There are existing facilities within the development which are depicted upon the plan; however, there are no apparent conflicts at this time. Please note Book 5752 page 635 covering existing facilities. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Martin Rodriguez (520) 991-5495 mrodriguez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power
03/25/2024 OK to Submit - Landscape Fast APPROVED
04/26/2024 Site Engineering APPROVED
05/08/2024 NPPO NOT REQUIRED
05/08/2024 Site Landscape NOT REQUIRED
05/08/2024 CDRC Post Review Express PENDING ASSIGNMENT
04/30/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: TROT – Tack Room Addition
Development Package (1st Review)
TD-DEV-0324-00099

TRANSMITTAL DATE: April 30, 2024

DUE DATE: April 29, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 27, 2025.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.2.D – The page number and total number of pages shown on sheet 3 is not correct.

2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0324-00099, adjacent to the title block on all sheets.

3. COMMENT: 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile,

4. COMMENT: 2-06.4.4.B – Label all streets that abut the subject property on the location map.

5. COMMENT: 2-06.4.4.C – Label the section, township, and range & section corners on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2-06.4.7.A.8 - For development package documents provide:

6. COMMENT: 2-06.4.7.A.8.b – Provide a lot coverage calculation that meets the requirements of UDC Article 6.4.3. Per UDC Table 6.3-1.A the max lot coverage is 15%.
If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
03/22/2024 CDRC Application Completeness Express REVIEW COMPLETED
04/04/2024 CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG.
04/04/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/04/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/04/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/08/2024 Fire New Construction REVIEW COMPLETED
03/26/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
03/28/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
04/29/2024 ROW Engineering Review REVIEW COMPLETED No Comments