Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | 12/10/24 Just sidewalk and ramps. Flatwork/sidewalk inspection and Handrail inspection and a grading inspection to ensure drainage away from the building. It is in a flood plane next to the Rillito. |