Permit: TD-DEV-0324-00073
Permit Details
Apply Date:
03/11/2024
Applicant:
Abraham Flores
Description:
Revision 1 - New Multi-Family Residential comprised of three separate buildings
Permit Reviews
Permit Number - TD-DEV-0324-00073
Permit Status: Issued
Permit Description: Revision 1 - New Multi-Family Residential comprised of three separate buildings
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2026 | AS-BUILT v.1 | 04/06/2026 | APPROVED |
| 12/04/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/07/2025 | APPROVED |
| 02/19/2026 | AS-BUILT v.1 | 02/23/2026 | APPROVED |
| 03/14/2024 | DEVELOPMENT PACKAGE NEW v.1 | 05/07/2024 | REQUIRES RESUBMIT |
| 06/21/2024 | DEVELOPMENT PACKAGE NEW v.2 | 07/29/2024 | REQUIRES RESUBMIT |
| 07/30/2024 | DEVELOPMENT PACKAGE NEW v.3 | 08/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-0324-00073
Permit Status: Issued
Permit Description: Revision 1 - New Multi-Family Residential comprised of three separate buildings
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/09/2025 | CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0324-00073
Permite Description: Revision 1 - New Multi-Family Residential comprised of three separate buildings
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | N/A | Canceled | |
| 03/17/2026 | For trash and recycling enclosures | N/A | Partial Pass | they’re good to pour the floor and the apron for the trash enclosures and pour the curb on the east side and north east side |
| 04/27/2026 | N/A | Partial Pass | Gustavo was out on this project and it falls in his jurisdiction | |
| 04/29/2026 | N/A | Not Ready | contractor Colby this morning to come out here at 1 o’clock to check the grade for the parking lot they had placed the AB but there is no Hubbs for the grade. I informed him that they needed to have hubs and to call their surveyors to have them put them in and call for a reinspection. | |
| 05/06/2026 | ENGR Paving | N/A | Partial Pass | 5/6/26 This is a paving inspection for AB in parking lot. Parking spaces 3" thick, drive area 4" thick. Survey hubs are in place and okay. AB Compaction tests ok, Submit to Portal. Some areas of concern were shaved and others raised. A Roller compacted these areas. Handicap parking also was checked for slope. There is a curb ramp that is missing at crosswalk to Refuse Enclosure. Also a curb cut to a basin is missing on east side of parking lot. North East corner of parking lot curb is broken. These curbs will need to be repaired/repoured. Okay to Pave with contractor at risk if any areas do not drain correctly per grading sheets. Do not schedule inspection For AB on same day as laying asphalt again. It needs to be inspected for day before. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0324-00073
Permit Description: Revision 1 - New Multi-Family Residential comprised of three separate buildings
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Inform the contractor to call if every two weeks for progress report call in for any footing inspections wait for the building. He has a copy of the trash enclosures per city plans and to have everything everything tested for density. |