Permit: TD-DEV-0324-00073

Parcel: 11501150A


Addresses:

365 E SAHUARO ST

Inspection Status: Not Ready

Inspection History: For trash and recycling enclosures

Date Description Inspector Results Comments
02/20/2026 For trash and recycling enclosures Not Ready 2/20/26
Footer for walls….
Verts in Refuse Enclosure must be #4 at 32" OC. 2 verts at wall ends and 3 verts at the corners. For your reference all rebar reinforcing for refuse enclosures per TSM section 8-01 calls for #4 rebar.
Reschedule this inspection when Verts are correct.
02/27/2026 For trash and recycling enclosures Partial Pass Okay to pour wall footings on refuse enclosures.
For trash and recycling enclosures Not Ready 3/5/26
Walls are not yet complete to first lift (4'). Reschedule pregrout inspection for first lift when wall for both enclosures are at 4'. Use horizontal reinforcement at 16" OC.
03/09/2026 For trash and recycling enclosures Partial Pass 3/9/26
Okay to grout 1st lift of wall. Contractor will add additional vertical #4 at back wall to get 32" OC on both enclosures before grouting. Grout all reinforced cells and vibrate all grout. Continue using horizontal reinforcement 16" OC on second lift. Schedule inspections for bollard footers and floor rebar mat before pouring.
03/17/2026 For trash and recycling enclosures Partial Pass they’re good to pour the floor and the apron for the trash enclosures and pour the curb on the east side and north east side