Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
9355 E VALENCIA RD
Apply Date:
03/24/2023
Applicant:
Jeff Lowy
Description:
Restricted Access - This project consists of the drilling and equipping of a new Tucson Water well site, Well G-012A. The project will be two phases. The first phase consists of only the clearing of the well site to accommodate the well drilling activities. Not other site grading or permanent infrastructure will be installed as part of the first phase of construction. The second phase, which intends to be permitted later once plans are completed, consists of the equipping of the well site with all the necessary permanent infrastructure for a fully functioning well site. This application is intended only to permit the first phase of construction. A Native Plant Preservation Plan for this work utilizing the set-aside method (per Tucson UDC, Sec 7.7.5.A.3.b) is being submitted for this initial phase of construction.

Permit Reviews

Permit Number - TD-DEV-0323-00188
Permit Status: Issued
Permit Description: Restricted Access - This project consists of the drilling and equipping of a new Tucson Water well site, Well G-012A. The project will be two phases. The first phase consists of only the clearing of the well site to accommodate the well drilling activities. Not other site grading or permanent infrastructure will be installed as part of the first phase of construction. The second phase, which intends to be permitted later once plans are completed, consists of the equipping of the well site with all the necessary permanent infrastructure for a fully functioning well site. This application is intended only to permit the first phase of construction. A Native Plant Preservation Plan for this work utilizing the set-aside method (per Tucson UDC, Sec 7.7.5.A.3.b) is being submitted for this initial phase of construction.
Start Date Submittal Complete Date Status  
04/15/2024 DEVELOPMENT PACKAGE REVIEW v.2 04/22/2024 APPROVED Review Details
03/27/2023 DEVELOPMENT PACKAGE REVIEW v.1 05/03/2023 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0323-00188
Permit Description: Restricted Access - This project consists of the drilling and equipping of a new Tucson Water well site, Well G-012A. The project will be two phases. The first phase consists of only the clearing of the well site to accommodate the well drilling activities. Not other site grading or permanent infrastructure will be installed as part of the first phase of construction. The second phase, which intends to be permitted later once plans are completed, consists of the equipping of the well site with all the necessary permanent infrastructure for a fully functioning well site. This application is intended only to permit the first phase of construction. A Native Plant Preservation Plan for this work utilizing the set-aside method (per Tucson UDC, Sec 7.7.5.A.3.b) is being submitted for this initial phase of construction.
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/21/2023 SITE - SWPPP Correction Notice Passed Well has been drilled and site has been graded. Minor trash on site should be cleaned up.
11/21/2023 SITE - Stormwater Follow-up Passed Well has been drilled and site has been graded. Minor trash on site should be cleaned up.
11/21/2023 SITE - SWPPP Violation Notice Passed Well has been drilled and site has been graded. Minor trash on site should be cleaned up.