Address Search: 9355 E VALENCIA RD
Search
Parcel Attributes
| Parcel | 14102013J |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | SR |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 9355 E VALENCIA RD
Date - 04/06/2026 5:56 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 9355 E VALENCIA RD
Date - 04/06/2026 5:56 p.m.
Total Number Of Permits - (6)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project | |
| TR-ROW-1124-01301 | Complete | 11/06/2024 | 11/13/2025 | Right-of-Way (ROW) | Road improvements for Valencia Kolb Rd to Houghton Rd | |
| TR-ROW-1024-01266 | Void | 10/29/2024 | N/A | Right-of-Way (ROW) | General Right-of-Way permit for the Valencia Road: Kolb Rd to Houghton Rd Roadway Improvements project. COT Job No. SR14 COT Plan No. I-2020-021 Proposed construction begins east of Kolb Road and End west of Houghton Road. The 4.27 miles of new roadway improvements include a six lane divided roadway , multi-use lanes, median, multi-use path, and drainage improvements. | |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project | |
| TD-DEV-0323-00188 | Issued | 03/24/2023 | 11/20/2026 | Development Package | Restricted Access - This project consists of the drilling and equipping of a new Tucson Water well site, Well G-012A. The project will be two phases. The first phase consists of only the clearing of the well site to accommodate the well drilling activities. Not other site grading or permanent infrastructure will be installed as part of the first phase of construction. The second phase, which intends to be permitted later once plans are completed, consists of the equipping of the well site with all the necessary permanent infrastructure for a fully functioning well site. This application is intended only to permit the first phase of construction. A Native Plant Preservation Plan for this work utilizing the set-aside method (per Tucson UDC, Sec 7.7.5.A.3.b) is being submitted for this initial phase of construction. | |
| TC-COM-0324-00397 | Inspections | 03/01/2024 | 07/07/2025 | Commercial Building | New Tucson Water Well Site |
Plans
Address: 9355 E VALENCIA RD
Date - 04/06/2026 5:56 p.m.
Total Number Of Plans - (2)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TP-ENT-1023-00039 | Complete | 10/12/2023 | N/A | -- Zoning Examiner Special Exception | Request to equip well G-012A and create a new well yard on the property. | |
| TP-PRE-0723-00280 | In Review | 07/31/2023 | N/A | -- Pre-Application Conference | We are requesting a special exception in order to equip well site G-012A. (Parcel number provided is incorrect. The correct parcel number is 141-02-013G) |