Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel14102013J
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningSR
Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Street & Route

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 9355 E VALENCIA RD
Date - 04/06/2026 5:56 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-73-45 Southeast 4066 4192

Permits

Address: 9355 E VALENCIA RD
Date - 04/06/2026 5:56 p.m.
Total Number Of Permits - (6)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1124-01301 Complete 11/06/2024 11/13/2025 Right-of-Way (ROW) Road improvements for Valencia Kolb Rd to Houghton Rd
TR-ROW-1024-01266 Void 10/29/2024 N/A Right-of-Way (ROW) General Right-of-Way permit for the Valencia Road: Kolb Rd to Houghton Rd Roadway Improvements project. COT Job No. SR14 COT Plan No. I-2020-021 Proposed construction begins east of Kolb Road and End west of Houghton Road. The 4.27 miles of new roadway improvements include a six lane divided roadway , multi-use lanes, median, multi-use path, and drainage improvements.
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TD-DEV-0323-00188 Issued 03/24/2023 11/20/2026 Development Package Restricted Access - This project consists of the drilling and equipping of a new Tucson Water well site, Well G-012A. The project will be two phases. The first phase consists of only the clearing of the well site to accommodate the well drilling activities. Not other site grading or permanent infrastructure will be installed as part of the first phase of construction. The second phase, which intends to be permitted later once plans are completed, consists of the equipping of the well site with all the necessary permanent infrastructure for a fully functioning well site. This application is intended only to permit the first phase of construction. A Native Plant Preservation Plan for this work utilizing the set-aside method (per Tucson UDC, Sec 7.7.5.A.3.b) is being submitted for this initial phase of construction.
TC-COM-0324-00397 Inspections 03/01/2024 07/07/2025 Commercial Building New Tucson Water Well Site

Plans

Address: 9355 E VALENCIA RD
Date - 04/06/2026 5:56 p.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
TP-ENT-1023-00039 Complete 10/12/2023 N/A -- Zoning Examiner Special Exception Request to equip well G-012A and create a new well yard on the property.
TP-PRE-0723-00280 In Review 07/31/2023 N/A -- Pre-Application Conference We are requesting a special exception in order to equip well site G-012A. (Parcel number provided is incorrect. The correct parcel number is 141-02-013G)