Permit Details

Status:
Complete
Type:
Development Package
Address:
1050 S PARK AV
Address NEW:
1050 S PARK AV
Apply Date:
01/14/2025
Applicant:
Brandy Burke
Description:
Rev 1 - Updates to sidewalk, drainage, grading, started 12.19.2025 ** Addition to existing building. This is a minor DP that has had a pre-submittal meeting. A variance for distance from residential zone has been approved. Attaching that information.

Permit Reviews

Permit Number - TD-DEV-0125-00008
Permit Status: Complete
Permit Description: Rev 1 - Updates to sidewalk, drainage, grading, started 12.19.2025 ** Addition to existing building. This is a minor DP that has had a pre-submittal meeting. A variance for distance from residential zone has been approved. Attaching that information.
Start Date Submittal Complete Date Status  
01/15/2025 DEVELOPMENT PACKAGE NEW v.1 01/24/2025 REQUIRES RESUBMIT Review Details
02/07/2025 DEVELOPMENT PACKAGE NEW v.2 03/21/2025 REQUIRES RESUBMIT Review Details
07/10/2025 DEVELOPMENT PACKAGE NEW v.4 08/01/2025 APPROVED Review Details
12/19/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 01/15/2026 REQUIRES RESUBMIT Review Details
06/05/2025 DEVELOPMENT PACKAGE NEW v.3 07/03/2025 REQUIRES RESUBMIT Review Details
01/22/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 01/26/2026 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0125-00008
Permit Description: Rev 1 - Updates to sidewalk, drainage, grading, started 12.19.2025 ** Addition to existing building. This is a minor DP that has had a pre-submittal meeting. A variance for distance from residential zone has been approved. Attaching that information.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/25/2025 PDSD Engineering Division Pre-Construction SITE Passed Pre-Construction meeting complete. Site is small and contained; no Stormwater Initial necessary.
01/30/2026 SITE - Zoning Final Passed
02/09/2026 ENGR Engineering Final Passed