Permit: TD-DEV-0123-00121
Permit Details
Apply Date:
01/26/2023
Applicant:
Greg Carlson
Description:
Revision 1 - grading permit
Permit Reviews
Permit Number - TD-DEV-0123-00121
Permit Status: Complete
Permit Description: Revision 1 - grading permit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/03/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 04/04/2023 | REQUIRES RESUBMIT |
| 07/26/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/11/2024 | APPROVED |
| 06/01/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 07/06/2023 | APPROVED |
| 01/26/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/01/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0123-00121
Permit Status: Complete
Permit Description: Revision 1 - grading permit
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/15/2023 | Right-of-Way (ROW) use permit for landscape & irrigation |
| 03/15/2023 | SPECIAL NPPO INSPECTION |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0123-00121
Permite Description: Revision 1 - grading permit
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | SITE - SWPPP Correction Notice | N/A | Not Applicable | |
| 04/05/2024 | SITE - SWPPP Violation Notice | N/A | Not Applicable | |
| 04/05/2024 | COT - ENGR - Site - Assurance Release | N/A | Not Applicable | |
| 04/05/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | N/A | Not Applicable | |
| 08/30/2024 | ENGR Grading Final | N/A | Failed | It was observed on the 29th of August that vehicles were parked in the basins. No hubs were observed in the initial walk through on the 29th. Dirt pile needs to have wattle around it. |
| 07/05/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time. No work happening on the site. Pads have been constructed Masons have been cut. Nothing else has been done. |
| 03/21/2025 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | Not ready, everything needs to be 100% completed as per plan. Landscaping, NPPO, Basins, Water Harevesting. Fencing would need to be removed as well as dumpster, port a jon. |
| 03/24/2025 | NPPO Pre-Construction | N/A | Canceled | In speaking with Manny it was decided to cancel all inspections until the engineering final can be completed in full to include, landscape, NPPO, Storm Water etc. At this time all 4 homes can be done as well and be in a move in ready state. |
| 03/21/2025 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Not ready, everything needs to be 100% completed as per plan. Landscaping, NPPO, Basins, Water Harevesting. Fencing would need to be removed as well as dumpster, port a jon. |
| 03/21/2025 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Not ready, everything needs to be 100% completed as per plan. Landscaping, NPPO, Basins, Water Harevesting. Fencing would need to be removed as well as dumpster, port a jon. |
| 03/21/2025 | ENGR Engineering Final | N/A | Not Ready | Not ready, everything needs to be 100% completed as per plan. Landscaping, NPPO, Basins, Water Harevesting. Fencing would need to be removed as well as dumpster, port a jon. |
| 03/21/2025 | SITE - Stormwater Final Inspection | N/A | Partial Pass | Notice of termination will be needed to be able to sign this as complete. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0123-00121
Permit Description: Revision 1 - grading permit
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 04/05/2024 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | Passed | ||
| 04/05/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 06/07/2024 | COT - ENGR - Stormwater | Passed | BMPs in place. adequate track out prevention. continue with biweekly’s. | |
| 01/10/2025 | Passed | Drainage pipe across the west driveline has passed. | ||
| 02/28/2025 | SITE - Stormwater Follow-up | Passed | ||
| 04/02/2025 | ENGR Engineering Final | Passed | DP is completed and sigened off | |
| 04/01/2025 | SITE - Stormwater Final Inspection | Passed |