Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - ENGR - Stormwater
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2024 | COT - ENGR - Stormwater | Partial Pass | 1) Storm water controls are in place according to SWPP. 2) Provide wattle around stock pile. 3) Inspections should be continued every 2 weeks or within 24 hours of moisture occurrence. 4) Insure if using a 3rd party that logs are kept up to date as required and available during construction. |
|
| 06/07/2024 | COT - ENGR - Stormwater | Passed | BMPs in place. adequate track out prevention. continue with biweekly’s. |