Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
01/10/2023
Applicant:
Chris Hitchcock
Description:
New Freddy's Restaurant with drive-thru

Permit Reviews

Permit Number - TD-DEV-0123-00101
Permit Status: Complete
Permit Description: New Freddy's Restaurant with drive-thru
Start Date Submittal Complete Date Status  
01/17/2023 DEVELOPMENT PACKAGE REVIEW v.1 03/02/2023 REQUIRES RESUBMIT Review Details
06/07/2023 DEVELOPMENT PACKAGE REVIEW v.2 07/10/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0123-00101
Permite Description: New Freddy's Restaurant with drive-thru
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/01/2023 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns at this time. Contractors are working on the installation of footers for the trash enclosure and portions of the building. No concerns for the stormwater.
04/25/2024 COT - ENGR - Stormwater N/A Partial Pass Robin with Pate
Scuppers are required were passing through a sidewalk.
consult with Project engineer regarding changes
05/03/2024 ENGR - Drainage Structures N/A Not Ready hey construction has been required to pull the bollard polls out and re-dig their locations 6 inches deeper or more to make sure we have enough concrete below the Baller tops. This work will be done first part of next week and a reinspection will be done to ensure everything is correct prior to pouring out the floor and the footer.
06/20/2024 ENGR Engineering Final N/A Partial Pass engineering has no issues it would prevent a level four temporary certificate of occupancy

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0123-00101
Permit Description: New Freddy's Restaurant with drive-thru
Total Completed Inspections - 6
Date Description Inspector Results Comments
10/30/2023 PDSD Engineering Division Pre-Construction SITE Passed 1) Details were gone over for the following;
a) stormwater control implementation
b) trash enclosure
c) site maintenance
d) inspections

2) Most wattle was in place previous to inspection, will need to be inspected every 2 weeks.

3) Plans were reviewed.

4) Signage for site SWPPP is in place.

5) Address is posted.
06/11/2024 COT - ENGR - Signage Final Passed
06/11/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
06/11/2024 SITE - Stormwater Final Inspection Passed
06/20/2024 For trash and recycling enclosures Passed OK for level four TCO
07/23/2024 ENGR Engineering Final Passed All items are complete.

Documents

File Name Document Type  
TD-DEV-0123-00101 NOT_V1.PDF DOCUMENTS VIEW
2_PLAN SET - USE THIS ONE - FREDDY'S AT THE BRIDGES - DP - 2023-06-08_V1.PDF DOCUMENTS VIEW
2_PLAN SET - USE THIS ONE - FREDDY'S AT THE BRIDGES - DP - 2023-06-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_C9-06-32_REZONING_PAD_V1.PDF DOCUMENTS VIEW
1_DRAINAGE REPORT - FREDDY'S AT THE BRIDGES - 2022-12-30_V1.PDF DOCUMENTS VIEW
1_PLAN SET - FREDDY'S AT THE BRIDGES - DP - 2023-01-10_V1.PDF DOCUMENTS VIEW
1_SOIL ASSESSMENT 1 OF 2_V1.PDF DOCUMENTS VIEW
1_SOIL ASSESSMENT 2 OF 2_V1.PDF DOCUMENTS VIEW
1_SWPPP - FREDDY'S AT THE BRIDGES - 2022-12-30_V1.PDF DOCUMENTS VIEW
1_TMP GEOTECH LMT 3-10-09_V1.PDF DOCUMENTS VIEW