Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0123-00101
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2024 | ENGR - Drainage Structures | Partial Pass | 2nd lift of CMU for trash enclosure is completed and all knockouts are present. All vertical # 5 rebar is present, and #5 rebar bond beam is completed and ready for grouting. |
|
05/03/2024 | ENGR - Drainage Structures | Not Ready | hey construction has been required to pull the bollard polls out and re-dig their locations 6 inches deeper or more to make sure we have enough concrete below the Baller tops. This work will be done first part of next week and a reinspection will be done to ensure everything is correct prior to pouring out the floor and the footer. |