Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
01/31/2024 ENGR - Drainage Structures Partial Pass 2nd lift of CMU for trash enclosure is completed and all knockouts are present.

All vertical # 5 rebar is present, and #5 rebar bond beam is completed and ready for grouting.
05/03/2024 ENGR - Drainage Structures Not Ready hey construction has been required to pull the bollard polls out and re-dig their locations 6 inches deeper or more to make sure we have enough concrete below the Baller tops. This work will be done first part of next week and a reinspection will be done to ensure everything is correct prior to pouring out the floor and the footer.