Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2024 | ENGR - Drainage Structures | Partial Pass | 2nd lift of CMU for trash enclosure is completed and all knockouts are present. All vertical # 5 rebar is present, and #5 rebar bond beam is completed and ready for grouting. |
|
| 05/03/2024 | ENGR - Drainage Structures | Not Ready | hey construction has been required to pull the bollard polls out and re-dig their locations 6 inches deeper or more to make sure we have enough concrete below the Baller tops. This work will be done first part of next week and a reinspection will be done to ensure everything is correct prior to pouring out the floor and the footer. |