Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | 1) Details were gone over for the following; a) stormwater control implementation b) trash enclosure c) site maintenance d) inspections 2) Most wattle was in place previous to inspection, will need to be inspected every 2 weeks. 3) Plans were reviewed. 4) Signage for site SWPPP is in place. 5) Address is posted. |