Permit: TC-SOL-1024-00673
Permit Details
Apply Date:
10/23/2024
Applicant:
Project Manager
Description:
Installation of a 13.825kw dc system/MPU 225A
Permit Reviews
Permit Number - TC-SOL-1024-00673
Permit Status: Inspections complete
Permit Description: Installation of a 13.825kw dc system/MPU 225A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2025 | RESIDENTIAL SOLAR REVISION v.1 | 01/29/2025 | APPROVED |
10/24/2024 | RESIDENTIAL SOLAR APP v.1 | 10/24/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-SOL-1024-00673
Permite Description: Installation of a 13.825kw dc system/MPU 225A
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | System should have a non fused disconnect, needs revised plans or swapped for non fused disconnect |
01/30/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | System should have a non fused disconnect, needs revised plans or swapped for non fused disconnect |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-SOL-1024-00673
Permit Description: Installation of a 13.825kw dc system/MPU 225A
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2025 | BULD - Electrical Clearance | Passed | Approved with pics - DGC Clearance to TEP is required for the solar meter | |
02/06/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Approved with pics - DGC Clearance to TEP is required for the solar meter |