Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2025 |
COT - RSOL - Electrical Final Solar Project |
|
Re-inspection required |
System should have a non fused disconnect, needs revised plans or swapped for non fused disconnect |
| 02/06/2025 |
COT - RSOL - Electrical Final Solar Project |
|
Passed |
Approved with pics - DGC Clearance to TEP is required for the solar meter |