Rev. 4: 08/27/2025 - Install Pics Rev. 3: 08/18/2025 - Install Pics Rev. 2: 08/04/2025 -- Revision 1. -- Installation of a 10.375kw dc system/1 Tesla Battery
Permit Reviews
Permit Number - TC-SOL-0625-00803
Permit Status: Complete
Permit Description: Rev. 4: 08/27/2025 - Install Pics
Rev. 3: 08/18/2025 - Install Pics
Rev. 2: 08/04/2025 --
Revision 1. --
Installation of a 10.375kw dc system/1 Tesla Battery
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2025 | RESIDENTIAL SOLAR REVISION v.1 | 08/27/2025 | APPROVED |
| 08/04/2025 | RESIDENTIAL SOLAR REVISION v.1 | 08/04/2025 | APPROVED |
| 06/16/2025 | RESIDENTIAL SOLAR APP v.1 | 06/16/2025 | APPROVED |
| 08/19/2025 | RESIDENTIAL SOLAR REVISION v.1 | 08/19/2025 | APPROVED |
| 07/23/2025 | RESIDENTIAL SOLAR REVISION v.1 | 07/23/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00803
Permite Description: Rev. 4: 08/27/2025 - Install Pics
Rev. 3: 08/18/2025 - Install Pics
Rev. 2: 08/04/2025 --
Revision 1. --
Installation of a 10.375kw dc system/1 Tesla Battery
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | 8/5/25 1. No corrections made, same as previous inspection. |
| 08/07/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 8/5/25 1. No corrections made, same as previous inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00803
Permit Description: Rev. 4: 08/27/2025 - Install Pics
Rev. 3: 08/18/2025 - Install Pics
Rev. 2: 08/04/2025 --
Revision 1. --
Installation of a 10.375kw dc system/1 Tesla Battery
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 08/28/2025 | BULD - Electrical Clearance | Passed | Approved solar and PW3 installation per pics - DGC/BAT Clearance to TEP is required for the solar meter |