Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
07/15/2025 BULD - Electrical Clearance Partial Pass Partial for the Tesla meter adapter - DGL Clearance was called into TEP
Pending solar final - NR
07/24/2025 BULD - Electrical Clearance Re-inspection required 7/23/25 Tesla powerwall mounted far too low to ground, if outside must follow E3405.2.
07/24/2025 BULD - Electrical Clearance Re-inspection required Add pad under Tesla battery to protect from degree and foliage, leave required .8 inch clearance for ventilation between pad and bottom of battery
08/05/2025 BULD - Electrical Clearance Re-inspection required 8/5/25
1. No corrections made, same as previous inspection.
08/20/2025 BULD - Electrical Clearance Re-inspection required DENIED via pics - please provide a solid surface under PW 3 per installation manual
08/28/2025 BULD - Electrical Clearance Passed Approved solar and PW3 installation per pics - DGC/BAT Clearance to TEP is required for the solar meter