Inspection Status: Re-inspection required

Inspection History: COT - RSOL - Electrical Final Solar Project

Date Description Inspector Results Comments
07/24/2025 COT - RSOL - Electrical Final Solar Project Re-inspection required 7/23/25 Tesla powerwall mounted far too low to ground, if outside must follow E3405.2.
07/24/2025 COT - RSOL - Electrical Final Solar Project Re-inspection required Add pad under Tesla battery to protect from degree and foliage, leave required .8 inch clearance for ventilation between pad and bottom of battery
08/05/2025 COT - RSOL - Electrical Final Solar Project Re-inspection required 8/5/25
1. No corrections made, same as previous inspection.
08/20/2025 COT - RSOL - Electrical Final Solar Project Re-inspection required DENIED via pics - please provide a solid surface under PW 3 per installation manual
08/28/2025 COT - RSOL - Electrical Final Solar Project Passed