Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | 7/23/25 Tesla powerwall mounted far too low to ground, if outside must follow E3405.2. | |
| 07/24/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | Add pad under Tesla battery to protect from degree and foliage, leave required .8 inch clearance for ventilation between pad and bottom of battery | |
| 08/05/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | 8/5/25 1. No corrections made, same as previous inspection. |
|
| 08/20/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | DENIED via pics - please provide a solid surface under PW 3 per installation manual | |
| 08/28/2025 | COT - RSOL - Electrical Final Solar Project | Passed |